The retractable lead, as tested here, consists of two parts. Firstly, the actual Roll-Leash (89 euros) and the matching Hip belt (40 euros). Alternatively, the Roll-Leash is also compatible with a matching ankle cuff from Ride Engine, or can be fitted to existing straps or harnesses to suit your individual needs. The necessary fitting materials are included.
The Ride Engine Retractable Leash combines a thin yet tear-resistant webbing strap (1.80 metres long) within the retraction mechanism with a fairly taut classic leash as the visible connection between the retraction housing and the board. The housing can be kept extremely compact thanks to the delicate webbing and is barely noticeable on the harness.
The (optional) waist strap is comfortably padded without being too thick and fastens with a buckle, which is then covered by a neoprene sleeve. The roll-up box is secured to it with two screws. The leash is attached to a short line on the board at the lower end using a loop-and-knot connection (see photos).
“You can’t feel the little box at the back of the harness at all.” Sonja Duschek, recreational foil rider
The strap fastens quickly; the neoprene sleeve fits snugly over it and then stays securely in place over the buckle. It’s best to attach the leash to the board whilst still on land, without using an additional carabiner. However, the loop can be quickly and easily released in the water when you come ashore later. The strap sits very comfortably around the hips and can be adjusted tight enough even for very slim waists. To do this, you can also thread the slightly thicker part of the strap through the adjustment buckle. For our test rider, the ‘outer’ part of the actual leash was almost exactly the length from her hip to the tail whilst foiling. Nothing dangles in the way, you can’t step on the leash, and there’s only very slight tension. The extension comes into play when handling the board on land and, above all, after crashes. With minimal tension, the leash automatically adjusts itself. This offers two major advantages in the event of a crash:
“Roll leashes offer several advantages: they are short enough not to get in the way, yet allow for the necessary distance from the equipment in the event of a fall.” Manuel Vogel, wingfoil tester
If spiral leashes become very taut after a fall, the board can sometimes accelerate rapidly towards you. This is completely avoided with this leash. The retraction mechanism safely winds the webbing back up without pulling any harder than necessary. “The only problem is,” says tester Sonja, “once you’ve got used to the comfort, going back to using a normal leash at some point.”
The Ride Engine Retractable Leash is very comfortable to wear and you hardly notice it. The connection between the winger and the board doesn’t dangle annoyingly on the deck. In the event of a fall, you end up further away from the board, and the risk of the board being accelerated towards the foil rider by the taut leash whilst in the water is eliminated.

Deputy Editor in Chief surf